Knowledge

Fit-out notes

Five practical guides are now full articles: how to read a renovation quote, the fit-out process, restaurants, shops, and offices. Six more are full too: laser-effect wallpaper, geometric LED tubes, L-shaped storage, fluted glass with brass and marble, commercial lighting, and daylight. Episodes 1–4 and the two marble notes are short summaries in English. Episode 7, on reading a gym unit, is a short summary in English. Ten further practical guides are short summaries in English: small-flat storage and circulation, open kitchens, bespoke furniture with the services, choosing a design firm, handover and snagging, minor works, light rental renovation, residential management approval, clinic, beauty and education fit-out, and industrial buildings for commercial use. Episodes 8 and 9, on large equipment access and hoisting, are short summaries in English. Episodes 10–12, on limited supply, gym flooring, and commercial ventilation, are short summaries in English. Episodes 13 and 14, on a toilet-to-shower upgrade and a multipurpose activity room, are short summaries in English. Episodes 15 and 16, on choosing a commercial unit and its toilet, are short summaries in English. Six renovation-abandonment notes — causes, choosing a firm, the contract checklist, remedies, a contractor who disappears, and progress checks before the next payment — are short summaries in English.

Practical guides

Fit-out notes

Commercial buildings

Renovation abandonment